Installation guide to replace a 3-Phase Cable - Charge Amps HALO
This article is intended for electricians/installers only!
Demo in Swedish, followed by article in English below
The 3-phase charging cable should have 6 pcs. wires: phase 1, phase 2, phase 3, earth, zero and the pilot wire.
1. Remove the 6-pole terminal from the circuit board.
2. Then disconnect the old cable from the terminal.
3. Pull the cable out of the grommet and replace with new cable in the chassis.
Connect the new cable to the terminal with the wires as shown below:
Pilot | Orange |
PE (jord) | Green-yellow |
N | Blue |
L1 |
Brown |
L2 |
Black |
L3 |
Grey |
4. Connect the terminal to the circuit board.
5. Seal the Halo.